2018 Operation

The place to discuss the LHC. Commissioning, operation, issues, events ....
andrewp
Posts: 38
Joined: Sat Jul 17, 2010 10:10 pm

Re: 2018 Operation

Post by andrewp » Tue Jun 12, 2018 5:09 am

22:32 to 23:55 I believe?

dukwon
Posts: 75
Joined: Fri Apr 10, 2015 1:04 pm
Contact:

Re: 2018 Operation

Post by dukwon » Wed Jun 13, 2018 1:48 pm

Global Post Mortem Event

Event Timestamp: 10/06/18 21:39:22.990
Fill Number: 6773
Accelerator / beam mode: PROTON PHYSICS / STABLE BEAMS
Energy: 6499200 [MeV]
Intensity B1/B2: 14259 / 17073 [e^10 charges]
Event Category / Classification: PROGRAMMED_DUMP / MULTIPLE_SYSTEM_DUMP
First BIC input Triggered: First USR_PERMIT change: Ch 1-Programable Dump b1: B T -> F on CIB.CCR.LHC.B1
At 22:32 they only dumped some probes

andrewp
Posts: 38
Joined: Sat Jul 17, 2010 10:10 pm

Re: 2018 Operation

Post by andrewp » Wed Jun 13, 2018 7:45 pm

Ah OK tnx. MD currently...

dukwon
Posts: 75
Joined: Fri Apr 10, 2015 1:04 pm
Contact:

Re: 2018 Operation

Post by dukwon » Sat Jun 16, 2018 9:50 am

Here's the lumi situation as of the start of MD1:
Lumi2018-model.LHCb.png
Predicted vs actual integrated lumi IP8
Lumi_20180616.png
Predicted vs actual integrated lumi IP1/5
Lumi_20180616.png (92.66 KiB) Viewed 89 times
intLumiRunAll.png
Integrated lumi over each year so far IP8
intLumiRunAll.png (14.78 KiB) Viewed 89 times
IntegratedLumiLHCbTime_Yearly.png
Integrated lumi over each year so far IP1/5
IntegratedLumiLHCbTime_Yearly.png (56.51 KiB) Viewed 89 times

Post Reply