It takes weeks to warm up a sector if cryo goes. A few hours with tripped power is nothing. The power cut was into the Meyrin site. The induced effects in the power grid tripped the cryo stuff. These things happen.Xymox wrote: I dont think it will cause almost any delay. It appears The LHC stayed cold and wont need to be re chilled. I would think mostly rebooting and such..
With regards to the energy consumption, LHC and experiments is around 120 MW