2017 Operation

The place to discuss the LHC. Commissioning, operation, issues, events ....
mfb
Posts: 168
Joined: Sat Oct 03, 2015 7:58 pm

Re: 2017 Operation

Post by mfb » Mon Aug 28, 2017 8:48 am

The pumps are running, of course. The gas is mainly frozen out at the walls. Heating the part up was the approach to get rid of the gas, but it can also release gas that was trapped elsewhere.

We had a nice long run with 1550 bunches, 100% design luminosity. Just 60% of the previous peak performance, but if that is a stable condition, it is much better than nothing.

jlourenc
Posts: 11
Joined: Wed Apr 27, 2011 4:52 am

Re: 2017 Operation

Post by jlourenc » Mon Aug 28, 2017 5:39 pm

Agreed, 0.4fb/d is a relief after all of those small dumped fills.
They’re roughly 10fb behind 2016 - by looking at the lumiplots, no science here - so as you said unless they unlock some luminosity somewhere, the 40fb are probably out of reach. Maybe beta 30cm would give a boost (assumimg they can get the optics and machine protection stuff done quickly)

jmc2000
Posts: 160
Joined: Sun May 08, 2011 2:51 pm

Re: 2017 Operation

Post by jmc2000 » Mon Aug 28, 2017 7:06 pm

Interesting... so am I right in saying that the beam can heat the pipe via inductive heating, thus releasing any frozen gas, and temporary failing of the cryogenics then adds to the problem as the frozen gas is heated?

This makes sense because the problem seemed to go away for a while as they gradually reached 1.7\nb/s, with the pumps able to handle the gradual increase of gas. The problem then suddenly reappearing when they stepped up the intensity further going for close to 2.0\nb/s; which released excessive gas.

If so, then there shouldn't be too much of a problem doing what they did before: slowly increasing the intensity once again, reducing the intensity as gas is released and removed by the pumps, then slowly increasing again etc. The good news is that despite the gas release, the LHC can still run at its design specification still reaching x2 this if the increase is done carefully and slowly.

JMc

mfb
Posts: 168
Joined: Sat Oct 03, 2015 7:58 pm

Re: 2017 Operation

Post by mfb » Mon Aug 28, 2017 11:16 pm

The machine operators made a table. It is ... not that nice.

2 fill attempts with 2556 bunches, both dumped during ramp due to 16L2.
7 fill attempts with 2220 bunches, 5 dumped during ramp due to 16L2, one dumped before SB for another reason, only one reached SB - only to get dumped by 16L2 later.
3 fill attempts with 1932 bunches, one dumped during ramp, one before SB, one in SB, all due to 16L2.
16 fill attempts with 1740 bunches, 5 dumped during ramp due to 16L2, 11 reached SB, and only 2 of these got dumped due to 16L2 later.
Some attempts with lower numbers of bunches, also with a high 16L2 dump rate.

1550 bunches had some reasonable success recently. 1700 with gaps in the bunch trains is discussed, going to 50 ns bunch spacing (with a maximum of 1500 bunches) is discussed as well.

jmc2000
Posts: 160
Joined: Sun May 08, 2011 2:51 pm

Re: 2017 Operation

Post by jmc2000 » Tue Aug 29, 2017 6:33 pm

So running with the current 1550b yields 0.3\fb/day = 2\fb/week at 55% efficiency giving 35 - 40\fb for 2017 which looks fine to me, bearing in mind that the hope was to accumulate > 100\fb for run 2. I don't see the point in changing the planned running parameters of the LHC significantly, just for the sake of an extra ~10\fb.

JMc

jmc2000
Posts: 160
Joined: Sun May 08, 2011 2:51 pm

Re: 2017 Operation

Post by jmc2000 » Wed Aug 30, 2017 11:37 pm

https://home.cern/cern-people/updates/2 ... ng-nothing

"On the basis of current statistics, there appears to be no direct correlation between the number of bunches and the number of beam dumps, so the task force is now planning tests with beams of up to 2200 bunches (last year’s maximum) to evaluate the situation."

Jmc

jlourenc
Posts: 11
Joined: Wed Apr 27, 2011 4:52 am

Re: 2017 Operation

Post by jlourenc » Fri Sep 08, 2017 4:15 pm

Seems like the backup plan of using 8b4e schemes is working nicely and the 40 might just be reacheable. Does anyome know the max number of bunches with this filling scheme. Google doesn’t help much ;)

Thanks
Joao

User avatar
terryburton
Posts: 13
Joined: Thu Mar 11, 2010 11:44 am

Re: 2017 Operation

Post by terryburton » Tue Sep 12, 2017 3:40 pm

Max bunches under the new scheme is about 1920 according to the following report:

http://home.cern/cern-people/updates/20 ... tion-holes

jmc2000
Posts: 160
Joined: Sun May 08, 2011 2:51 pm

Re: 2017 Operation

Post by jmc2000 » Thu Sep 14, 2017 5:30 pm

Latest 131st LHCC meeting has 45\fb as year end target :
https://indico.cern.ch/event/658856/con ... pt2017.pdf

JMc

dukwon
Posts: 163
Joined: Fri Apr 10, 2015 1:04 pm
Contact:

Re: 2017 Operation

Post by dukwon » Thu Sep 14, 2017 6:24 pm

lumi.png

jmc2000
Posts: 160
Joined: Sun May 08, 2011 2:51 pm

Re: 2017 Operation

Post by jmc2000 » Mon Oct 02, 2017 10:24 pm

Schedule has been updated:
https://beams.web.cern.ch/sites/beams.w ... e_2017.pdf

It looks as if they've reallocated two weeks from the proton-proton run to 5 TeV p-p Reference
& Low Energy High Beta run. Currently hitting > 3\fb/week so ~ 45\fb for the remaining 7 weeks still looks realistic.

JMc

ferar
Posts: 14
Joined: Mon May 10, 2010 2:44 am

Re: 2017 Operation

Post by ferar » Wed Nov 15, 2017 1:12 am

Gruffalo has woken up? What that means? Anyone knows?

Thanks
fernando

dukwon
Posts: 163
Joined: Fri Apr 10, 2015 1:04 pm
Contact:

Re: 2017 Operation

Post by dukwon » Wed Nov 15, 2017 12:55 pm

Where did you see that? In the morning meeting slides they described 16L2 as "waking up", presumably meaning losses there are starting to be a problem again.