What has been the most serious post 2010 LHC delay?

The place to discuss the LHC. Commissioning, operation, issues, events ....
Post Reply
jmc2000
Posts: 160
Joined: Sun May 08, 2011 2:51 pm

What has been the most serious post 2010 LHC delay?

Post by jmc2000 » Thu Aug 18, 2011 7:59 pm

Over the past 8 days, the operation of the LHC has taken a hammering with a day off to replace the SPS magnet, 4 for the failure of the cyogenics, and another 2 because of the power cut. So that makes a loss of a week out of 6 for this segment.

What's been a similar bad period post 2010?

Post Reply