Search found 159 matches

by Danny252
Sun Mar 21, 2010 9:40 pm
Forum: Controversial topics
Topic: Review of Long-Term Black Hole Risks
Replies: 56
Views: 64733

Re: Review of Black Hole Risks

Minor apology, I've been a bit dicky all night. I blame annoying people.

But it still holds that the paper doesn't seem to hold up.
by Danny252
Sun Mar 21, 2010 6:51 pm
Forum: Controversial topics
Topic: Review of Long-Term Black Hole Risks
Replies: 56
Views: 64733

Re: Review of Black Hole Risks

First off, his first (and most often used) source states that BH creation is "extremely hypothetical scenario" in the opening paragraph. He makes comments about millions of black holes being created by White Dwarfs and Neutron Stars. This raises the question of "why do we see White Dwarfs if they ma...
by Danny252
Sun Mar 21, 2010 2:31 pm
Forum: The Accelerator
Topic: 2010 Briefings, Schedules and Problems
Replies: 48
Views: 61062

Re: 2010 Briefings, Schedules and Problems

Today's plan: * Re-establish 450 GeV beams * Measure and correct the optics and beam parameters at 450 GeV - on going and will continue (as soon as Pt6 access is complete) * Ramp at 3.5 TeV * Measure and correct the optics and beam parameters at 3.5 TeV * Protection devices and collimators setting-u...
by Danny252
Fri Mar 19, 2010 3:44 pm
Forum: The Accelerator
Topic: Older Events and discussion 3/22/10
Replies: 156
Views: 181924

Re: ** Current Events and discussion **

Wallmott wrote:Since both beams were running, does that mean that they collided at any point?
No. As said before, the bunches weren't synchronised, and also the beams are deflected in the IPs so that they aren't actually crossing paths until official collisions/Physics runs
by Danny252
Fri Mar 19, 2010 3:43 pm
Forum: The Accelerator
Topic: 3.5 TeV accelleration ! WORLD RECORD !
Replies: 20
Views: 26503

Re: 3.5 TeV accelleration ! WORLD RECORD !

They plan first collisions for 30th press conference or whatever are they planning to hold that day. Technically speaking, half-energy (1.75 TeV) collisions are already happening (with residual particles in beam pipe, with beam pipe itself and in dump), yet another world record. It just doesn't hap...
by Danny252
Wed Mar 17, 2010 7:07 pm
Forum: The Accelerator
Topic: 2010 Briefings, Schedules and Problems
Replies: 48
Views: 61062

Re: 2010 Briefings, Schedules and Problems

17 WE M 0700-1500 nQPS re-parameterization part 2/TECHNICAL STOP / CHECK SPS beam check beam quality from SPS for 5e10 in TL 17 WE A 1500-0000 HWC tests / Operational cycle tests S34 45 78 81 / CHECK SPS beam 17 WE N 0000-0400 Ramp for LBDS tests - no beam. LBDS energy tracking, BETS tolerances and ...
by Danny252
Wed Mar 17, 2010 1:15 pm
Forum: Portal link and forum suggestions
Topic: Not welcome on IRC?
Replies: 18
Views: 25008

Re: Not welcome on IRC?

emmylou wrote:Naka are you having the same problem? like by Invite only? whats is that all about?
Aye, they've set it to invite only, so no one can access it.

I'll be on irc.gimp.org in future then :)
by Danny252
Fri Mar 12, 2010 7:54 pm
Forum: The Accelerator
Topic: 2010 Briefings, Schedules and Problems
Replies: 48
Views: 61062

Re: 2010 Briefings, Schedules and Problems

Same format as above: 12 FRI A 1500-2300 Trial ramp to 1.2 TeV - test Q and orbit feedback 12 FRI N 2300-0700 TOTEM interlock tests (2 hours - no beam). Aperture 13 SA M 0700-1100 AC dipole 13 SA M 1100-1500 Contingency 13 SA A 1500-2300 Beam quality tuning 13 SA N 2300-0700 Aperture 14 SU M 0700-19...
by Danny252
Tue Mar 09, 2010 11:02 pm
Forum: The Accelerator
Topic: Older Events and discussion 3/22/10
Replies: 156
Views: 181924

Re: ** Current Events and discussion **

Funny thing is that the ALICE site is still showing the Page 1 status notes - maybe these are sent through a different system than the VISTARs?
by Danny252
Tue Mar 09, 2010 9:00 pm
Forum: The Accelerator
Topic: Older Events and discussion 3/22/10
Replies: 156
Views: 181924

Re: ** Current Events and discussion **

I wonder if it's "Scheduled F..."? Going by how all the SFs are a fair way in the future and are a whole shift, it might be scheduled slack time of some sort.
by Danny252
Tue Mar 09, 2010 4:49 pm
Forum: The Accelerator
Topic: 2010 Briefings, Schedules and Problems
Replies: 48
Views: 61062

Re: 2010 Briefings, Schedules and Problems

They've got a running (possibly constantly updated) schedule going now I believe, linked on the Progress page as "Latest Planning Outline". Copied 24 hours or so of info. M - Morning Shift (0700-1500) A - Afternoon Shift (1500-2300) N - Night Shift (2300-0700) Date - Day - Shift - Hours Allocated - ...
by Danny252
Mon Mar 08, 2010 7:36 pm
Forum: The Accelerator
Topic: Older Events and discussion 3/22/10
Replies: 156
Views: 181924

Re: ** Current Events and discussion **

Both beams back at 2032.
by Danny252
Mon Mar 08, 2010 7:35 pm
Forum: Off topic
Topic: fun from cern
Replies: 4
Views: 7839

Re: fun from cern

You get the Liquid Helium, I'll get the magnets ;)
by Danny252
Mon Mar 08, 2010 7:23 pm
Forum: The Accelerator
Topic: 2010 Briefings, Schedules and Problems
Replies: 48
Views: 61062

Re: 2010 Briefings, Schedules and Problems

No schedules in the 0830 due to a problem with an Emergency Stop Switch last night (which led to cryo problems), and the 1700 hasn't appeared yet!
by Danny252
Sun Mar 07, 2010 5:20 pm
Forum: The Accelerator
Topic: 2010 Briefings, Schedules and Problems
Replies: 48
Views: 61062

Re: 2010 Briefings, Schedules and Problems

0900 Schedule: Sunday: 08:00 –14:00 : Injection and beam dump setting-up 14:00 –24:00 : Collimator setting-up –BLM 24:00 -07:00 : Damper setting-up Monday: 07:00 –15:00 : Aperture measurements 15:00 –21:00 : Protection device checks and setting-up 21:00 –23:00 : Ramp trial without beam –collimator &...